Product Details:
Payment & Shipping Terms:
|
Goods: | Heat Treatment Furnace | Certification: | CE |
---|---|---|---|
Warranty: | 12 Months | Chamber Size: | 400x400x400mm |
Temperature Control: | 50 Segments Programmable PID Pro Auto Control | Max. Temperature: | 1700℃ |
Operation Temperature: | 1600℃ | Heating Element: | MoSi2 Rod Heating Element |
Power: | Electric | Thermocouple: | B Type |
High Light: | high temperature box furnace,scientific muffle furnace |
Heat Treatment Furnace Instruction :
The lab heat treatment furnaces are the right choice for daily laboratory use. These models stand out for their excellent workmanship, advanced and attractive design, and high level of reliability. The muffle furnaces come equipped with either a flap door or lift door at no extra charge.
model | SP-1700B-64L |
Standard Working Temperature | 1600.C ( continuous ) |
Maximum Working Temperature | 1700.C ( < 3 hrs) |
Inside Chamber Size | Customizable |
Temperature Control | 30 steps programmable and PID automatic control |
Heating Rate | 0~15.C/ min (suggestion:<10.C) |
Temperature Accuracy | +/- 1.C |
Temperature uniformity | +/- 1.C |
Working Voltage | AC 380V 3- Phase 60/50 Hz (or according to your requirement) |
Furnace structure | Double shell with fan cooling |
Heating Element | MoSi2 heating element |
Thermocouple | B type |
Max. Power | 24KW |
Standard package included with the furnace: | |
Part description | Quantity |
Thermal couple | 1 pc |
Door block | 1pc |
Stainless steel hook | 1 pc |
Thermal gloves | 1 pair |
Operation manual | 1 set |
MoSi2 rod (extra) | 2pcs |
Many experiments and procedures taken in the lab requiring extreme heat environment from 400-1900.C. For this purpose, the high temperature muffle furnace steps in as the necessary part of laboratory equipment. SUPER furnace are providing the muffle furnace at a affordable cost including box muffle furnace, crucible furnace, dental furnace, atmosphere furnace, vertical furnace, tube furnace and etc.
Delivery times :
♥ For some normal standard size furnaces and components, we have in stock; So we can send out in 2-3 days;
♥ Other customized sizes the delivery time is from 15 days to 30 days according to different products request.
Our Warranty :
Warranty: One year limited warranty with lifetime support, excluding heating element and ceramic tube damaged by user.
Attention: Any damages caused by the use of corrosive and acidic gases, and any damage from wrong operate and use are not under the coverage of One Year Limited Warranty.
About Shipping
1. Order processing?
Please allow a processing time of 12-24 hours for your order(s) to ship. Equipment orders will take up to 2 weeks before leaving our warehouse. (Order processing is done during normal weekdays only, no holidays or weekends.)
2. Shipping methods?
1 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
2 Responsible for the damage during the shipping process, will change the damage part for you for free.
Contact Person: Ms. Vera Zuo
Tel: 86-13607649242